Port of Portland - Deicing Collection System Force Main Modification

Title or Project

Port of Portland - Deicing Collection System Force Main Modification

Access Type

Open Access

Files

Loading...

Media is loading
 

Faculty Advisor

Jordan Farina, PhD

Description

The purpose of the project is to produce a design that involves installing two automated flow control valves and new pipe onto an existing force main to solve depressurization and maintenance issues on Port of Portland's deicing fluid collection system. Our solution involves an erosion control plan, dewatering plan, a piping and instrumentation diagram, Simulink model, AutoCAD model, mechanical spec sheet, and a civil spec sheet.

Project Information

EGR 483

EGR 484

Port of Portland - Deicing Collection System Force Main Modification

Share

COinS